Processing Request...

Filter

    • UNC Kenan Stadium Synthetic Perimeter

      Year: 2017

      This was a unique job installing an artificial turf perimeter around the entire field leaving the playing field surface natural grass.

      • Demolition of existing shrubs and turf area.
      • Establishing subgrade for areas receiving synthetic turf.
      • Replaced existing irrigation system.
      • Installed new drainage system.
      • Installed curb to attach synthetic turf.
      • Installed gravel base and lasergraded
      • Provided and installed artificial turf infill system.
    • Baltimore Ravens M&T Bank Stadium

      Year: 2016

      This job took place at Baltimore Ravens game field; M&T Bank Stadium. The job consisted of stripping out and replacing 27,300sf of sod. Sod was replaced with Tifway 419 Bermuda GameOn Grass overseeded with perennial rye.

    • Carolina Panthers Football Practice Field

      Year: 2004

      Football Practice Facility: Synthetic Turf Infill System / Drainage

    • University of Tennessee Neyland Stadium

      Year: 2016

      Project included stripping and replacement of full field with GameOn Grass Tifway 419 Bermuda sand based sod grown on plastic and hauling spoils from the site.

    • UVA Scott Stadium 2017

      Year: 2017

      Full renovation of UVA Scott Stadium football field.

      • Demolition of existing field
      • Installation of new drainage system
      • Gravel base layer install.
      • Rootzone layer install
      • New irrigation system
      • Installation of new sod and some synthetic turf areas.
      Watch Video
    • Virginia Tech Lane Stadium & Practice Field

      Year: 2016

      Lane Stadium: Scope of work consisted of stripping 2" of sod and organic material, blecavating rootzone to 6" depth, laser grading and installation of Latitude sod.  Football Practice Field: Stripping and replacing sod.

    • Washington Redskins FedEx Field Replacement

      Year: 2016

      Scope of Work:  Strip, blecavate, laser grade, reinstall irrigation and resod with GameOn Grass sod grown on plastic.  Install synthetic turf on concrete apron areas.

    • Philadelphia Eagles Football Stadium

      Year: 2011

      Supply Sod on Plastice for End Zone Replacement Mid Season

    • Cincinnati Bengals

      Year: 2011

      Paul Brown Stadium: Sprig and topdress football practice fields

    • USC Williams Brice Stadium

      Year: 2016

      Demolition of existing football field, drainage and irrigation system. Installation of new playing field to include laser grade, drainage system, irrigation system, natural turf surface and appurtenances.

    • Charleston Riverdogs

      Year: 2018

      Field Improvements including turf removal, drainage system repairs and additions, irrigation system removal and replacement, grading, sand base, sod installation, infield, warning track, and bullpens. Also a pile driven wall system was installed to eleviate sub-base movement.

      Watch Video
    • Texas A&M

      Year: 2014

      Take a look at our recent Texas A&M project. The video provides a time lapse from start to finish with our Texas A&M project.

      Watch Video
    • UNC Kenan Memorial Stadium

      Year: 2016

      Sod replacement: Installation of tifway Bermuda regular cut sod.

    • The College of William & Mary Zable Stadium

      Year: 2016

      Construction in progress.

    • Baltimore Ravens Endzone Replacement

      Year: 2016

      This project was an emergent sod replacement. The day after the Army vs. Navy football game 2016, we stripped out the Army/Navy logos painted in the endzones and replaced them with fresh GameOn Grass. The Ravens grounds crew got to work painting the Ravens logos and the field was ready for the next game in less than 48 hours!

    • George Mason University RAC

      Year: 2016

      Renovation of natural turf playing surface; all clay surfaces in and around the playing surface; and the warning track around the playing surface.  Project includes installation of Tilway 419 Bermuda sod.

    • University of Tennessee Haslam FB Practice Field

      Year: 2016

      Full replacement of offensive and defensive field using a combination of GameOn Grass and regular cut sod.

    • Washington Redskins Park Field

      Year: 2016

      Scope of work: Strip, blecavate, laser grade and resod, Install perimeter and surface drainage.  Install synthetic turf drill area.

    • WFU Sports Performance Football Practice Facility

      Year: 2016

      Project includes removal of existing synthetic turf field and grass field; laser grade and installation of drainage, gravel layer and root zone layer for the sand-based natural field; laser grade, installation of drainage, concrete curbing and dynamic stone base over geo-textile fabric for the synthetic turf field; as well as the installation of synthetic perimeter around both fields. 

    • University of North Carolina at Charlotte Football

      Year: 2012

      New construction of football practice fields consisting of modified soil, cambridge drainage, sand injection, irrigation, bermuda sod, fencing and field equipment

      • University of North Carolina Kenan Football

        Year: 2011

        Kenan Stadium Field: End zone renovations including installation of drainage, rootzone, sod, synthetic turf base and turf systems.

      • Washington Redskins FedEx Stadium

        Year: 2011

        Mid-season immediate play turf replacement.

      • University of Tennessee Football Practice Field

        Year: 2010

        Replacement of football practice field turf mid season using thick cut sod grown on plastic

      • Lenoir Rhyne University Football Stadium Field

        Year: 2010

        Football Stadium Field: drainage installation

      • Davidson College Richardson Football Field

        Year: 2010

        Richardson Field: New construction of synthetic turf base and field installation

      • University of Virginia at Wise Football Stadium

        Year: 2011

        Removal of old turf system, remediation of base including adding drainage, and installation of new synthetic turf system

      • University of Kentucky Football Stadium & Practice

        Year: 2011

        Stadium and Practice Fields: Strip sod with combinator and install Carolina Green thick cut bermuda sod on areas in both fields

        • University of Tennessee Indoor Football Practice

          Year: 2010

          Neyland-Thompson Sports Center - Replacement of indoor football practice field synthetic turf mid season

          Watch Video
        • Louisiana State University Football Stadium Field

          Year: 2011

          Field demolition and grading work to prep for new sod installation

          • Western Carolina University Football Stadium Field

            Year: 2008

            Football Stadium Field: Mid-season stadium field renovation - Strip/remove turf, renovate base, install new turf

            Watch Video
          • Duke University Multi-purpose Fieldhouse

            Year: 2011

            Prep subgrade, intall synthetic turf base, nailer and turf, wall padding, hanging goal system, ballstop netting, and outdoor synthetic turf area

          • University of Tennessee

            Year: 2007

            Football Stadium: Field Replacement, sand-based field

          • University of Connecticut Bushnell Football

            Year: 2011

            Removal of existing sod, modification of soil for improved drainage, grading, and resod field.

          • East Carolina University Football Practice Field

            Year: 2005

            Football Practice Field: Renovation of 2 natural fields, Synthetic turf installation

          • Emory & Henry University Football Field

            Year: 2008

            Synthetic turf field installation (Fieldturf)

          • University of Tennessee Football Practice Field Rootzone

            Year: 2011

            Football Practice Field: Renovation of rootzone to improve drainage, sand cap and sod installation, synthetic turf area installation

          • University of Virginia Football Practice Facility

            Year: 2013

            Construction of an indoor/outdoor football practice facility. Project consists of removal of existing turf, laser grading, dynamic stone base and turf installation

            • College of Charleston

              Year: 2010

              Design and build soccer fields

            • College of William and Mary Albert Daly Soccer Field

              Year: 2012

              Renovations to the existing soccer field installing cambridge style drainage system, laser grading, field drainage, irrigation, sand injection and sod installation

              • Emory & Henry University

                Year: 2008

                Synthetic Turf field installation (Fieldturf)

              • George Mason University

                Year: 2004

                Soccer Stadium Field: Laser grade, create uniform soil profile, install cambridge drainage system, new irrigation, sod and topdress

              • Liberty University Soccer Practice Field

                Year: 2016

                Project consists of installation of new practice soccer field and full replacement of existing soccer stadium complex. Both fields are identically sand-capped flat fields.

              • Liberty University Soccer Stadium

                Year: 2015

                Osborne Stadium Field Replacement: Excavate existing soil, laser grade subgrade, install drainage and irrigation system including pump station and backflow preventer and install sod.

                • Mary Baldwin University

                  Year: 2018

                  Renovation of existing natural soil field to sand based system. Established subgrade. Installed collector drain around field perimeter. Installed lateral drains throughout playing area. New irrigation system. Installed gravel and rootzone layers. Sod with Latitude 36. Also, installed drainage system in "D-ring"areas.

                  Watch Video
                • Tusculum College Lacrosse Soccer Field

                  Year: 2016

                  Work performed: Removal and installation of irrigation heads, blecavate, laser grade, and sprigging.

                • University of South Carolina Soccer Field

                  Year: 2016

                  Project to begin in 2016.

                  • Virginia Tech

                    Year: 2016

                    Project to begin in 2016.

                  • North Raleigh Christian Academy Soccer Field

                    Year: 2009

                    Soccer field installation consisting of laser grading, soil admendments, irrigation, cambridge drainage and sod installation

                  • University of Connecticut Bushnell

                    Year: 2011

                    Soccer field installation consisting of laser grading, soil admendments, irrigation, cambridge drainage and sod installation

                  • Arnold Burton Complex Salem VA

                    Year: 2014

                    Renovation of one Softball field at the Arnold Burton Complex in Salem VA.

                    • City of Myrtle Beach Grand Park

                      Year: 2010

                      Construction of 3 synthetic turf multipurpose (softball/soccer) fields

                    • Elon University Hunt Softball Field

                      Year: 2012

                      New construction of a natural turf softball field to include cambridge drainage, modified soil, irrigation, infield installation, warning track, synthetic turf collar and sod installation

                      • JMU Softball Practice Field

                        Year: 2017

                        This was a renovation of an existing softball practice facility. We demolished the existing field and essentially built a new one.

                        • Establish new subgrade
                        • Installed black chain-link fence around perimeter including gates and dugouts.
                        • Installed backstop padding and fence top safety padding.
                        • Installed aluminum team benches and bleachers.
                        • New batting cages constructed
                        • New domestic water and irrigation installed.
                        • New electric lines run to supply dugouts and scoreboard.
                        • Infield mix and warning track material installed.
                        • Installed sod.
                      • University of South Carolina Softball Field

                        Year: 2011

                        Beckham Softball Stadium: Field renovation including drainage, infield, warning track, irrigation, sod bullpens and fencing

                        Watch Video
                      • University of Tennessee Intramural Fields

                        Year: 2012

                        New construction of 6 natural turf fields and 4 synthetic turf fields. (8 multipurpose fields and 2 softball fields)

                      • George Mason University

                        Year: 2009

                        Laser grade, install irrigation, rootzone, warning track, infield, bullpens, collar, sod.

                      • Greensboro Day

                        Year: 2007

                        Baseball/softball field construction

                        • Longwood University

                          Year: 2011

                          Renovation of fields including drainage installation, regrade infield and mounds, irrigation upgrades, and sod installation

                          • Longwood University

                            Year: 2011

                            Renovation of fields including drainage installation, regrade infield and mounds, irrigation upgrades, and sod installation

                            • Washington Nationals Baseball Stadium

                              Year: 2011

                              Construction of baseball stadium including drainage, irrigation, rootzone, sod, infield, warning track, and bullpens.

                            • University of South Carolina Baseball Stadium

                              Year: 2008

                              New construction of a sand-based baseball stadium field.

                            • University of North Carolina Boshamer Stadium

                              Year: 2009

                              Boshamer Stadium: Sand-based baseball stadium field (drainage, irrigation, soil modification, grading, warning track, infield install)

                            • University of Tennessee Baseball Stadium

                              Year: 2008

                              Design/Build Renovation - include cambridge drainage, irrigation, bull pens, warning track, and sod

                            • Charlotte Knights

                              Year: 2016

                              Job included improvements to infield area, base paths and home plate area. We tilled in a clay mix and then laser graded to provide both a smooth playing surface and smooth transition to turf area.

                            • Charleston Southern University Baseball

                              Year: 2016

                              Project to be completed in Summer 2016.

                            • Cary USA Baseball Natl Training Complex Field 3

                              Year: 2016

                              Renovation of sand-based natural turf field. Project involves excavation of surface, amending the rootzone, infield and warning track renovation and sod installation.

                            • West Virginia Power

                              Year: 2014

                              Renovation of the playing field surface including excavation, tarp drainage, soil amendments, grading and sod installation.

                            • Charlotte Christian Baseball Field

                              Year: 2016

                              Installation of synthetic turf infield.

                            • Pirate City Bradenton FL Field 1

                              Year: 2015

                              Removal of existing natural turf, laser grading field, installation of cambridge drainage and sod installation.

                            • Myrtle Beach Pelicans BB&T Coastal Field

                              Year: 2011

                              Sand-based baseball stadium field consisting of drainage, irrigation, soil modification, grading, warning track, infield install, and sod installation

                            • University of Virginia Davenport Baseball Field

                              Year: 2012

                              Renovate to sand-base baseball field including drainage, rootzone, irrigation, infield skinned area, synthetic collar and sod installation

                              Watch Video
                            • Potomac Nationals Pfitzner Baseball Stadium

                              Year: 2011

                              Strip sod, cut infield 14", lower entire field grade, new irrigation, cambridge drainage and Patroit Sod

                            • Virginia Tech English Baseball Field

                              Year: 2011

                              Convert existng field to synthetic turf, strip organics,upgrade drainage, install dynamic base, synthetic turf, dugouts, padding, netting, fencing

                            • Radford University Baseball Stadium

                              Year: 2010

                              Renovation of Baseball Field - drainage, irrigation, grading, warning track, synthetic turf collar installation

                            • Elon University Latham Park Baseball Stadium

                              Year: 2010

                              Latham Baseball Field renovation - synthetic turf infield installation and outfield drainage & irrigation installation, turf & grade renovation

                              Watch Video
                            • Wake Forest University Gene Hooks Baseball Stadium

                              Year: 2010

                              Stadium Field: Synthetic Turf Field Installation

                              Watch Video
                            • Carolina Mudcats Five County Stadium

                              Year: 2009

                              Five County Stadium: Strip, subgrade, install perimter & sand-base drainage, soil mix, irrigation, laser grade, sod

                              Watch Video
                            • Belton Honea Path Anderson SC

                              Year: 2016

                              Baseball field drainage improvements. Project consists of the installation of a warning track along the outfield fence, Cambridge drainage system in existing field, warning track on sides tapering to 5' at dugout, relocation of irrigation lines, supply and installation of Tifway 419 Bermuda sod.

                            • George Mason University Baseball Field Renovation

                              Year: 2010

                              Baseball Field renovation, to include cambridge drainage, irrigation, and synthetic turf infill behind home plate

                            • Princeton Rays Baseball

                              Year: 2010

                              Baseball Field

                              Watch Video
                            • University of Virginia at Wise Baseball Field

                              Year: 2009

                              Baseball Field Install new synthetic turf baseball collar

                            • City of Asheboro McCrary Park Baseball Field

                              Year: 2010

                              McCrary Park Baseball Field renovation - synthetic turf infield installation and outfield turf & grade renovation

                            • Longwood University Baseball Field

                              Year: 2011

                              Renovation of fields including drainage installation, regrade infield and mounds, irrigation upgrades, and sod installation

                            • Bluefield Orioles Baseball

                              Year: 2006

                              Renovation, Drainage and irrigation

                            • Virginia Tech Baseball

                              Year: 2006

                              Drainage installation

                            • Rockingham Community College Baseball Field

                              Year: 2007

                              Irrigation, fencing, backstop, sidewalk, infield, sod

                            • City of Virginia Beach Princess Anne Complex

                              Year: 2005

                              Princess Anne Athletic Fields: New construction of 16 fields, soil amendments, laser grade, irrigation, drainage, sod

                            • Greensboro Day Baseball

                              Year: 2007

                              Baseball/softball field construction

                            • North Carolina State University Doak Baseball

                              Year: 2002

                              Doak Stadium: Laser grade, irrigation, sand based rootzone, drainage, sod, infield mix, warning track

                            • Greensboro Grasshoppers

                              Year: 2004

                              New construction of baseball stadium field

                            • Fort Bragg MLB Baseball Field

                              Year: 2016

                              Installation of Tifway 419 Bermuda Sod & bullpen installation.

                            • UNC Greensboro Baseball Stadium

                              Year: 2001

                              Baseball Stadium: Design/build sand-based baseball stadium field

                            • Ashley Booth Field City of Myrtle Beach

                              Year: 2013

                              Turf renovation converting natural turf grass to artificial turf. Project consists of erosion control, laser grading, installation of sub-drainage system, dynamic stone base, concrete sidewalk and fencing

                            • City of Myrtle Beach Grand Park Synthetic

                              Year: 2010

                              Construction of 3 synthetic turf multipurpose (softball/soccer) fields

                            • Metrolina Christian

                              Year: 2010

                              Beginning in 2015, construction of new multipurpose fields including well installation, water lines, irrigation and grassing.

                              • The College of William & Mary Dillard Complex

                                Year: 2015

                                Dillard Complex Rec Field: Install Cambridge Drainage System - Turf renovations consist of laser grading, field drainage, irrigation, sand injection, and sod installation

                                • Town of Mt Pleasant SC Various Sports Fields

                                  Year: 2016

                                  Installed Cambridge Drainage systems on several multipurpose fields. Also used sand injection system on fields with the worst water issues.

                                • UNC Finley Fields North

                                  Year: 2017

                                  This project invovled construction of one natural surface playing field including a surronding track; and a large synthetic turf field lined for muiltipurpose use

                                  • Laser grade subgrade
                                  • Install concrete curb with chainlink fence in curb
                                  • Installed a ball-stop netting system tied in to the fence.
                                  • Installed sub surface darinage.
                                  • Installed gravel base layers under sythetic turf.
                                  • Installed synthetic turf system with Brock Powerbase anti-shock pad.
                                  • Installled underdrainage system
                                  • Laser grade
                                  • Install new irrigation system
                                  • Installed new drainage system
                                  • Installed gravel and rootzone layers
                                  • Provide and install Tifway 419 Bermuda Sod
                                  • Installed shot put pads
                                  • Installed hammer and discus pad
                                  • Installed concrete "tent pad"
                                • University of Tennessee Intramural Fields

                                  Year: 2012

                                  New construction of 6 natural turf fields and 4 synthetic turf fields. (8 multipurpose fields and 2 softball fields)

                                • W&M Anaheuser-Busch Field

                                  Year: 2016

                                  • Install basic erosion control measures that include a construction entrance, silt fence, safety fence, tree protection and inlet protection.
                                  • Demo existing storm water outfall, fencing, concrete pad and curb
                                  • Excavate existing topsoil to establish a subgrade. Spoils will be disposed off-site to an approved dumpsite.
                                  • Laser grade subgrade to a mirror image of finish grade. Laser grading to a tolerance of 1/4" over 25’ will be used during all grading operations.
                                  • Install 10”,8” and 6” HDPE collector lines to include two 8” cleanouts
                                  • Install storm water structures with two 48” manholes, 18” RCP and outfall spreader
                                  • Install 12” flat panel pipe and tie into collector lines.
                                  • Install Concrete anchor curb with wooden nailer along perimeter of synthetic turf.
                                  • Install 390’ of concrete anchor curb with channel drain. Catch basins will tie into the 6” collector lines.
                                  • Install 730 lf of new 8’ vinyl chain link fence with 3 gates. Fence will be installed within the concrete anchor curb.
                                  • Install geo-textile fabric over the entire field.
                                  • Install 4” under Type B turf and 6” stone gravel base material under Type A turf, laser grade, and compact in preparation for artificial turf installation
                                  • Grade disturbed areas around the synthetic field and seed with fescue grass seed.
                                  • Remove construction entrance and repair disturbed areas.
                                  • Clean up site for final inspection.
                                • Wingate University Track & Field

                                  Year: 2013

                                  Project consists of prep subgrade, laser grading, sub-drainage system, dyanamic stone base, concrete anchor curb, artificial turf and netting

                                  • City of Virginia Beach

                                    Year: 2005

                                    Princess Anne Athletic Fields: New construction of 16 fields, soil amendments, laser grade, irrigation, drainage, sod

                                  • University of Tennessee Cross Country Track

                                    Year: 2016

                                    Cross country track improvements include installation of additionl drainage, weed control, aerifying and seeding, resurfacing and top-dressing.

                                    • University of Tennessee Research Plot

                                      Year: 2012

                                      Synthetic turf dynamic stone base pad consisting of 15 individual plot areas including irrigation

                                    • UVA The Lawn

                                      Year: 2012

                                      To improve the quality and coverage of turf in the high wear and high shade areas through cambridge drainage, turf renovation and sod replacement

                                    • Wake Forest University Cross Country

                                      Year: 2015

                                      Cross Country track renovations.

                                      • Wake Forest University Indoor Batting Cages

                                        Year: 2010

                                        Indoor Batting Cages: Installation of synthetic turf in indoor batting cages.

                                      • William & Mary Busch Field

                                        Year: 2016

                                        Field Renovation Project to begin in 2016

                                        • University of Virginia Field Hockey

                                          Year: 2011

                                          Removal of existing turf, base renovation and expansion, installation of new turf system

                                        • Myrtle Beach Batting Cages

                                          Year: 2015

                                          Installation of one double softball batting cage system and one single softball batting cage system, including fabrication and installation of site improvements.

                                          • Brandreth Horse Farm

                                            Year: 2016

                                            On this project we made soil amendments and improved the riding surface of an enclosed arena.

                                            • Basic leveling with soil planer blade to prep base prior to installation of the approved base and layer materials.
                                            • Provide and install 2” layer approximately 325 tons of compactible dry screenings (Vulcan Materails--M10) to establish a base layer. Compact base aggregate prior to installation of topping layer.
                                            • Provide and install 5” layer approximately 675 tons of washed aggregate screenings (Vulcan Manufactured Sand-Washed). Grade to a smooth and level condition.
                                          • Charlotte Christian Stadium

                                            Year: 2015

                                            Removal of existing turf, laser grade, and installation of sythetc turf field and track resurface.

                                            • Charlotte Motor Speedway

                                              Year: 2016

                                              Carolina Green stripped out the perimeters of the grass areas along pit road, re-graded to provide a smooth transition from asphalt to dirt, and re-sodded the area.

                                            • Donnelly Horse Arena

                                              Year: 2018

                                              This project involved constructing a new horse riding arena on top of native soil.

                                              • Spray out and dispatch vegetation. Grade subgrade
                                              • Provide and install 4" aggregate base over subgrade.
                                              • Provide and install 1" of angular sand over base, blend top 1" into base
                                              • Compact and lasergrade arena for smooth riding surface.
                                              • Build wooden fence, install sod around perimeter to stabilize.
                                            • Elon University Field House

                                              Year: 2012

                                              Installation of a synthetic turf area and sand pit

                                              • JMU Memorial Hall

                                                Year: 2016

                                                On this project we turned an old basketball gym into a batting cage area for Baseball/Softball. Carolina Green provided and installed non-infill synthetic turf. We installed the netting for the batting cage system. Also, we took down and removed the old basketball backboards and hoops.

                                              • Liberty Throws

                                                Year: 2016

                                                The project included building a new Hammer/Discuss/Multipurpose field. We laser-graded to provide a smooth final grade. Installed a concrete hammer/throws circle with center drainage. Erected a NCAA certified Hammer/Throws Cage. Installed a new irrigation system and put down 33,000 sf of Latitude 36 sod.

                                              • UNC Navy Field

                                                Year: 2016

                                                Project included the emoval of existing turf, laser grading, and installation of GameOn Grass sod grown on plastic.

                                                • University of Tennessee Golf Practice Facility

                                                  Year: 2010

                                                  Project consisted of sprigging the fairway, tee boxes and green. Fertilization, installation of drainage to tie into existing fairway drain, grade burm to capture runoff from riparian slope and sod installation

                                                • Ashley Booth Field City of Myrtle Beach

                                                  Year: 2013

                                                  Turf renovation converting natural turf grass to artificial turf. Project consists of erosion control, laser grading, installation of sub-drainage system, dynamic stone base, concrete sidewalk and fencing

                                                • Charlotte Christian Baseball Field

                                                  Year: 2016

                                                  Installation of synthetic turf baseball infield. Construction to begin in 2016.

                                                • Charlotte Christian Stadium

                                                  Year: 2015

                                                  Removal of existing turf, laser grade, and installation of sythetic turf field and track resurface.

                                                  • ETSU Football Field

                                                    Year: 2017

                                                    This project included the construction of a brand new field in a new stadium at East Tennessee State University.

                                                    • Lasergrade Subgrade
                                                    • Install nailer for turf attachment
                                                    • Installed drainage system including flat panel drain.
                                                    • Installed dynamic stone base over geotextile fabric.
                                                    • Provide and install artificial turf including custom 50 yardline and endzone logos.
                                                    • Installed goalpost and balllstop netting system.
                                                  • JMU Field Hockey

                                                    Year: 2014

                                                    JMU Field Hockey – 2014 Removed existing turf, E-Layer and Stone Base. Replaced irrigation, installed a 3” Porous Asphalt Surface, a 15mm EDPM E-Layer and a new Field Hockey Artificial Turf System.

                                                  • JMU Soccer

                                                    Year: 2014

                                                    Converting existing natural grass field to artificial turf.

                                                  • JMU Softball

                                                    Year: 2014

                                                    Converting existing natural grass field to artificial turf.

                                                  • Lenoir-Rhyne Football Moretz Stadium

                                                    Year: 2015

                                                    Renovation of a natural grass field to a synthetic turf field. Inculuding complete renovation of the irrigation system, installation of drainage system and dynamic stone base and Permavoid collection system. The field was completed with the installation of Fieldturf.

                                                  • UNC Baseball Collar

                                                    Year: 2016

                                                    Boshamer Stadium: Sand-based baseball stadium field (drainage, irrigation, soil modification, grading, warning track, infield install)

                                                  • University of Virginia Football Practice Facility

                                                    Year: 2013

                                                    Construction of an indoor/outdoor football practice facility. Project consists of removal of existing turf, laser grading, dynamic stone base and turf installation

                                                    • Virginia Tech English Baseball Field

                                                      Year: 2011

                                                      Convert existng field to synthetic turf, strip organics,upgrade drainage, install dynamic base, synthetic turf, dugouts, padding, netting, fencing

                                                    • Wake Forest Indoor Football Field

                                                      Year: 2016

                                                      Project includes removal of existing synthetic turf field and grass field; laser grade and installation of drainage, gravel layer and root zone layer for the sand-based natural field; laser grade, installation of drainage, concrete curbing and dynamic stone base over geo-textile fabric for the synthetic turf field; as well as the installation of synthetic perimeter around both fields. 

                                                    • Wingate University Track & Field

                                                      Year: 2013

                                                      Project consists of prep subgrade, laser grading, sub-drainage system, dyanamic stone base, concrete anchor curb, artificial turf and netting

                                                      • University of Virginia Field Hockey

                                                        Year: 2011

                                                        Removal of existing turf, base renovation and expansion, installation of new turf system

                                                      • Elon University Hunt Softball Field

                                                        Year: 2012

                                                        New construction of a natural turf softball field to include cambridge drainage, modified soil, irrigation, infield installation, warning track, synthetic turf collar and sod installation

                                                        • University of Virginia Davenport Baseball Field

                                                          Year: 2012

                                                          Renovate to sand-base baseball field including drainage, rootzone, irrigation, infield skinned area, synthetic collar and sod installation

                                                          Watch Video
                                                        • University of Tennessee Intramural Fields

                                                          Year: 2012

                                                          New construction of 6 natural turf fields and 4 synthetic turf fields. (8 multipurpose fields and 2 softball fields)

                                                        • Carolina Panthers Football Practice Field

                                                          Year: 2004

                                                          Football Practice Facility: Synthetic Turf Infill System / Drainage

                                                        • Duke University Multi-purpose Fieldhouse

                                                          Year: 2011

                                                          Prep subgrade, intall synthetic turf base, nailer and turf, wall padding, hanging goal system, ballstop netting, and outdoor synthetic turf area

                                                        • City of Myrtle Beach Grand Park

                                                          Year: 2010

                                                          Construction of 3 synthetic turf multipurpose (softball/soccer) fields

                                                        • University of Tennessee Indoor Football Practice

                                                          Year: 2010

                                                          Neyland-Thompson Sports Center - Replacement of indoor football practice field synthetic turf mid season

                                                          Watch Video
                                                        • University of Tennessee Football Practice Field Rootzone

                                                          Year: 2011

                                                          Football Practice Field: Renovation of rootzone to improve drainage, sand cap and sod installation, synthetic turf area installation

                                                        • Emory & Henry University Football Field

                                                          Year: 2008

                                                          Synthetic turf field installation (Fieldturf)

                                                        • Wake Forest University Baseball

                                                          Year: 2010

                                                          Stadium Field: Synthetic Turf Field Installation

                                                          Watch Video
                                                        • Wake Forest University Indoor Batting Cages

                                                          Year: 2010

                                                          Indoor Batting Cages: Installation of synthetic turf in indoor batting cages.

                                                        • Davidson College

                                                          Year: 2011

                                                          New construction of synthetic turf base and field installation

                                                        • Radford University Baseball Stadium

                                                          Year: 2010

                                                          Renovation of Baseball Field - drainage, irrigation, grading, warning track, synthetic turf collar installation

                                                        • George Mason University

                                                          Year: 2010

                                                          Baseball Field renovation, to include cambridge drainage, irrigation, and synthetic turf infill behind home plate

                                                        • University of Virginia Davenport Baseball Collar

                                                          Year: 2009

                                                          Baseball Field Install new synthetic turf baseball collar

                                                        • University of Virginia at Wise Football Stadium

                                                          Year: 2011

                                                          Removal of old turf system, remediation of base including adding drainage, and installation of new synthetic turf system

                                                        • Elon University Baseball

                                                          Year: 2010

                                                          Latham Baseball Field renovation - synthetic turf infield installation and outfield drainage & irrigation installation, turf & grade renovation

                                                          Watch Video
                                                        • City of Asheboro

                                                          Year: 2010

                                                          McCrary Park Baseball Field renovation - synthetic turf infield installation and outfield turf & grade renovation

                                                        • University of Virginia at Wise

                                                          Year: 2009

                                                          Baseball Field: Install new synthetic turf baseball collar

                                                        Scroll through Our projects

                                                          • © Carolina Green Corp. All Rights Reserved. Website & Marketing by WEBPRO

                                                          Placeholder

                                                          Placeholder