Processing Request...

Filter

    • WFU Hearn Plaza

      WFU Hearn Plaza was completed in 2019. This was a renovation of a lawn area on WFU campus. We installed a little drainage, installed and tilled in soil amendments, then installed Fescue sod on all disturbed areas.

    • Wake Forest Indoor Football Field

      Project includes removal of existing synthetic turf field and grass field; laser grade and installation of drainage, gravel layer and root zone layer for the sand-based natural field; laser grade, installation of drainage, concrete curbing and dynamic stone base over geo-textile fabric for the synthetic turf field; as well as the installation of synthetic perimeter around both fields. 

    • Wake Forest University Baseball

      Stadium Field: Synthetic Turf Field Installation

      Watch Video
    • Wake Forest University Cross Country

      Cross Country track renovations.

      • Wake Forest University Gene Hooks Baseball Stadium

      • Wake Forest University Indoor Batting Cages

        Indoor Batting Cages: Installation of synthetic turf in indoor batting cages.

      • Wake Forest University Indoor Batting Cages

        Indoor Batting Cages: Installation of synthetic turf in indoor batting cages.

      • WFU Sports Performance Football Practice Facility

        Project includes removal of existing synthetic turf field and grass field; laser grade and installation of drainage, gravel layer and root zone layer for the sand-based natural field; laser grade, installation of drainage, concrete curbing and dynamic stone base over geo-textile fabric for the synthetic turf field; as well as the installation of synthetic perimeter around both fields. 

      Scroll through Our projects

        • © Carolina Green Corp. All Rights Reserved. Website & Marketing by WEBPRO

        Placeholder

        Placeholder