    • JMU Baseball

      Year: 2019

      The JMU Baseball Project in 2019 included replacing the synthetic turf on the Baseball field and expanding the warning track. We removed and disposed of existing old turf. The excavated and removed the existing warning track material. New subgrade and WT material were installed and graded. FieldTurf’s Double Play Synthetic Turf system was installed on the prepared base.

    • JMU Baseball Project

      Year: 2019

      The JMU Baseball Project in 2019 included replacing the synthetic turf on the Baseball field and expanding the warning track. We removed and disposed of existing old turf. The excavated and removed the existing warning track material. New subgrade and WT material were installed and graded. FieldTurf’s Double Play Synthetic Turf system was installed on the prepared base.

    • JMU Field Hockey

      Year: 2014

      JMU Field Hockey – 2014 Removed existing turf, E-Layer and Stone Base. Replaced irrigation, installed a 3” Porous Asphalt Surface, a 15mm EDPM E-Layer and a new Field Hockey Artificial Turf System.

    • JMU Soccer

      Year: 2014

      Converting existing natural grass field to artificial turf.

    • JMU Softball

      Year: 2014

      Converting existing natural grass field to artificial turf.

    • Lenoir-Rhyne Football Moretz Stadium

      Year: 2015

      Renovation of a natural grass field to a synthetic turf field. Inculuding complete renovation of the irrigation system, installation of drainage system and dynamic stone base and Permavoid collection system. The field was completed with the installation of Fieldturf.