  • Brandreth Horse Farm

    On this project we made soil amendments and improved the riding surface of an enclosed arena.

    • Basic leveling with soil planer blade to prep base prior to installation of the approved base and layer materials.
    • Provide and install 2" layer approximately 325 tons of compactible dry screenings (Vulcan Materails--M10) to establish a base layer. Compact base aggregate prior to installation of topping layer.
    • Provide and install 5" layer approximately 675 tons of washed aggregate screenings (Vulcan Manufactured Sand-Washed). Grade to a smooth and level condition.