|
University of Virginia -
Football Practice Fields Carolina Green was selected in 2001 as the sports field provider for UVa. Athletics, and has performed all sports field construction and renovation since that time. Jobs have included design build/renovation of stadium turf, reconstruction of football practice facility, practice fields, baseball, and soccer. Work included Cambridge slit drainage systems, irrigation, soil modification, laser grading, sod and sprig installation. |
|
North
Carolina State University -
Football Practice Fields |
![]() |
|
|
Duke
University Koskinen Soccer Field A 96,000 sf design/build project including excavation and laser grade preparation of sub-grade, installation of sand slit drainage and irrigation systems, soil modification using sand and an organic compost manufactured by Carolina Green. Field supports all Duke Soccer and Lacrosse programs. |
|
| City
of Myrtle Beach - Doug Shaw Stadium Design/build renovation project. Carolina Green removed unsuitable material and added USGA sand due to the high organic content of the existing soil. Limited outfall of existing storm drains necessitated a very intensive drainage network. State of the art irrigation system and specially blended sand cap maximized growth of TifSport Bermuda sprigs. |
![]() |
|
![]() |
City
of Wilmington- Legion Stadium & Hardee
Baseball Stadium Carolina Green was contracted to renovate Legion Stadium Field in 2000. Challenges with the site were related to it's former use as a horse track, and later an auto speedway dirt track. Renovations consisted of stripping existing sod, re-grading the field and installing irrigation and sand slit drainage systems. The City of Wilmington contacted Carolina Green again in 2002 for the design/build of Hardee Baseball Stadium in which similar construction was performed. |
|
Wingate University Softball
Field |
|
|
|
Wingate University Football
Stadium & Practice Fields New design/build construction was performed at Wingate University 's Football Stadium and Practice field in 1998. Renovations included laser grading, installation of topsoil, drainage and irrigation systems. Sand, compost, fertilizer and lime were incorporated into the topsoil to maximize the growing medium for hybrid Bermuda sprigs. In addition to the football facilities, Carolina Green was the design/build contractor for Wingate's Softball Facility in 1999 and Baseball Field in 1996. |
|
| University of Virginia at
Wise Carolina Green was asked to design/build a new baseball field in 2002 on an existing field within the perimeters of a jogging track. Their goal was to maximize field space within the limits of the track while correcting severe grade and drainage issues. Existing dugouts and fencing were removed, allowing us to shift the field to acquire proper field dimensions and laser grade the field to proper elevations. Stockpiled topsoil was redistributed. Sand slit drainage, irrigation, infield soil mix, warning track with drain, and bluegrass sod were installed. Vinyl fencing, bullpens and windscreen were the finishing elements to the field. The discovery of springs in right field were an unexpected challenge. |
![]() |
|
|
Western Carolina University Baseball
Field 2003 design/build renovation project including removal of the existing sod, infields and fence, installation of new irrigation and sand slit and perimeter drainage systems. Soil modification, installation of infield conditioners, sod and artificial turf, warning track, windscreen and new Green Monster Fencing make this field one of the finest. |
|
| University of Virginia Scott
Football Stadium Field Renovation of stadium field post concert event. Project involved stripping/removal of sod, fumigation, Blecavating, laser grading and TifSport sod installation. |
![]() |
|
|
University of North Carolina Greensboro Baseball Stadium Field Construction of sand-based baseball stadium field. | |
University of South
Carolina Williams Brice Football Stadium Field |
![]() |
|
![]() |
Memorial
Stadium, City of Charlotte , NC One of our first major renovation projects involving stripping of sod, soil modification, laser grading, irrigation and sod installation. |
|
|
||
North Carolina State University – Doak Baseball Stadium Field Complete renovation of existing stadium field. Project involved the modification of rootzone, drainage and irrigation installation, sand cap, laser grading, infield installation, bullpens, warning track, sod installation and topdressing. Coordination of work with building contractors proved to be the major challenge. |
||
![]() College of Charleston – Patriot's Point Renovation of existing field in 2003 involving stripping existing sod, installation of soil amendments and blecavating, laser grading, installation of irrigation and Cambridge drainage systems and sod. |
||
![]() Montreat College Construction of softball & soccer fields involving laser grading, irrigation, infield installation, and sodding. |
||
![]() Cannon School Construction of high school level baseball, softball and soccer fields. Project included laser grading, removal of rocks & debris, adding soil amendments, infield installations, sprigging and grow-in, backstop netting and bullpens. |
||
![]() Virginia Tech – Soccer Field Installation of new soccer field including rootzone modification, laser grading, blecavating, installation of sand slit drainage system, collector drain lines, irrigation system, and bluegrass sod. |
||
![]() UNC Charlotte Baseball 2003 Design/build renovation of existing poorly draining field. Installation included soil blending and laser leveling, Cambridge drainage installation, irrigation, infield and warning track modification, and sod. |
||
Copyright © 1999
- 2010 Carolina Green Corp. E-Mail Carolina Green
|
Site Design
By: Webspin Graphics
and Web Design
|